Cotton / Informing the local authority about cotton:
The Works and Roads Office in the Cotton Directorate, Hadramout Governorate, continues a campaign of backfilling excavations inside the (asphalt) highway, in coordination with the leadership of the local authority represented by Mr.
Yesterday, work continued on the main road, starting from the land bridge in Al-Akkad area in the west to Jouja junction in the east, with a distance of more than 700 meters, using the manual compacting machine to strengthen and strengthen the maintenance and resistance of drilling.
The director of the Works and Roads Office, Brother: Abdel Rahim Rabie Bakhmis, and a number of specialized engineers and technicians are supervising the implementation of the campaign’s work.
Vehicle drivers and citizens expressed their thanks and appreciation to the local authority and the Public Works Office for continuing the campaign of backfilling excavations caused by rainwater, torrential rain, tankers and locomotives with large tonnage, which led to the disruption of vehicle and bicycle traffic on the public street, in addition to avoiding traffic accidents due to these excavations.
The campaign work continues on a weekly basis under the directives of the director general of the directorate, who has previously carried out campaigns in previous periods to fill excavations in the main road and sub-streets in Al-Qattan City and its suburbs.
ليست هناك تعليقات:
إرسال تعليق